Baringo · Active
Chemususu Catchment
Farms ringing the Chemususu Dam catchment, where soil washing off hillside plots was silting the reservoir that supplies Eldoret town.

This is a farm-edge project rather than a forest-block project: terracing, cover cropping and fodder-tree intercropping on the slopes directly above the dam, aimed at cutting the sediment load reaching Chemususu — Eldoret's main water source.
38
of 90 ha restored
9,800
trees planted
265
households engaged
15 January 2023
work began
Ksh 640,000 raised30%
Goal: Ksh 2,100,000
Supporting: Chemususu Catchment
Give to protect a water tower
100% of this gift is tracked against this project's donation goal.
